Construction project management : (Record no. 8204)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01586nam a22002297a 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20190801134655.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 190801b xxu||||| |||| 00| 0 eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
International Standard Book Number | 9789332542013 |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | ACL |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | ENG |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 624.068 4 |
Item number | JHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Jha, Neeriaj Kumar |
245 ## - TITLE STATEMENT | |
Title | Construction project management : |
Remainder of title | theory and practice |
250 ## - EDITION STATEMENT | |
Edition statement | 2nd ed. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Delhi: |
Name of publisher, distributor, etc. | Pearson, |
Date of publication, distribution, etc. | 2018. |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xxvi, 869p.; |
Other physical details | PAPER BACK |
Dimensions | 20 cm. |
500 ## - GENERAL NOTE | |
General note | Civil Engineering |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Table of Content<br/><br/>1. Introduction<br/>2. Project Organization<br/>3. Construction Economics<br/>4. Client's Estimation of Project Cost<br/>5. Construction Contract<br/>6. Construction Planning<br/>7. Project Scheduling and Resource Levelling<br/>8. Contractor's Estimation of Cost and Bidding Strategy<br/>9. Construction Equipment Management<br/>10. Construction Accounts Management<br/>11. Construction Material Management<br/>12. Project Cost and Value Management<br/>13. Construction Quality Management<br/>14. Risk and Insurance in Construction<br/>15. Construction Safety Management<br/>16. Project Monitoring and Control System<br/>17. Construction Claims, Disputes, and Project Closure<br/>18. Computer Applications in Scheduling, Resource Levelling, Monitoring, and Reporting<br/>19. Factors Behind the Success of a Construction Project<br/>20. Linear programming<br/>21. Transportation, transshipment and assignment problems<br/>• References<br/>• Review Questions<br/>• Answers to the Objective Questions<br/>• Appendices<br/>• Index |
520 ## - SUMMARY, ETC. | |
Summary, etc. | Construction project management |
653 ## - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | Civil Engineering |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Permanent location | Current location | Shelving location | Date acquired | Source of acquisition | Cost, normal purchase price | Inventory number | Total Checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type | Public note | Total Renewals | Date last checked out |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Non-fiction | ADBU Azara Campus Library | ADBU Azara Campus Library | Reference | 01.08.2019 | UNIQUE BOOKS | 729.00 | UB/INV/2019-2020/179 | 624.068 4 JHA | 16852 | 01.08.2019 | 1 | 25.07.2019 | Books | Placed in Azara Campus Library Reference Section | ||||||
Non-fiction | ADBU Azara Campus Library | ADBU Azara Campus Library | Reference | 01.08.2019 | UNIQUE BOOKS | 729.00 | UB/INV/2019-2020/179 | 3 | 624.068 4 JHA | 16853 | 19.02.2024 | 2 | 25.07.2019 | Books | Placed in Azara Campus Library | 1 | 01.02.2024 |