Motion and time study design and measurement of work

By: Barnes, Ralph MosserMaterial type: TextTextLanguage: Eng. Publication details: New Delhi: Wiley, 2014Edition: 7th edDescription: xi, 689p.; PAPER BACK 22 cmISBN: 9788126522170Subject(s): Mechanical EngineeringDDC classification: 658.542
Contents:
Contents: 1. Productivity 2. Definition and Scope of Motion and Time Study 3. History of Motion and Time Study 4. The General Problem-Solving Process 5. Work Methods Design - The Board View 6. Work Methods Design - Developing a Better Method 7. Process Analysis 8. Activity Charts; Man and machine Charts 9. Operation Analysis 10. Micromotion Study 11. Fundamental Hand Motion 12. Motion Study and Micromotion Study Equipment making the Motion Pictures 13. Film Analysis 14. The use of Fundamental Hand Motions 15. Principles of Motion Economy as Related to the use of the Human Body 16. Principles of Motion Economy as Related to the Work Place 17. Principles of Motion Economy as Related to the Design of Tools and Equipment 18. Motion Study, Mechanization, and Automation 19. Standardization - Written Standard Practice 20. Time Study; Time Study Equipment; Making the Time Study 21. Time Study: Determining the Rating Factor 22. Time Study: Determining Allowances and Time 23. Determining Time Standards from Standard Data and Formulas 24. Use of Standard Data and Formulas for Gear Hobbing 25. Computer Aided Time Study 26. Computerized Machine and Equipment Downtime Monitoring and Reporting 27. Predetermined Time Systems: The Work-Factor Systems 28. Predetermined Time Systems: Methods-Time Measurement 29. Standard Data from Predetermined Times- Computer Aided Wage Incentive Application 30. Work Sampling 31. Measuring Work by Physiological Methods 32. Fatigue 33. Human Factors 34. Wage Payment- The Relation of Motion and Time Study to Wage Incentives 35. Multy-Factor wage Incentive Plans Evaluating and Controlling Factors Other Than Labor 36. Extent to Which Motion and Time Study may be Profitably Used 37. Motion and Time Stuidy Training Programs - Deliberate Change 38. Training the Operator - Effect of Practice 39. Motivation and Work 40. Job Enlargement: A manufacturing System Designed for people- Volvo Improving the Quality of Work Life at General Motors 41. Evolution of Measurement, Incentives and Design of Work at Kodak Park 42. Motorola Participative Management program 43. The Lakeview Plan; Appendix A: Wage Incentive Manual; Appendix B: Matric System Conversion Tables; Problems; Bibliography; periodicals; Index.
Summary: Motion ,Time, Study Design, Measurement , Work.
List(s) this item appears in: Management
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Collection Call number Copy number Status Notes Date due Barcode
Reference Reference ADBU Azara Campus Library
Reference
ADBU Azara Campus Library
Reference
Reference 658.542 BAR (Browse shelf(Opens below)) 1 Not For Loan Placed in School of Technology Library. 14775
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 2 Available Placed in School of Technology Library. 14776
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 3 Available placed in azara campus library 15131
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 4 Available placed in azara campus library 15132
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 5 Available Placed in Azara Campus Library. 16099
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 6 Available Placed in Azara Campus Library. 16100
Books Books ADBU Azara Campus Library
Mechanical Engineering
ADBU Azara Campus Library
Mechanical Engineering
Non-fiction 658.542 BAR (Browse shelf(Opens below)) 7 Available Placed in Azara Campus Library. 16101

Mechanical Engineering

Contents:
1. Productivity
2. Definition and Scope of Motion and Time Study
3. History of Motion and Time Study
4. The General Problem-Solving Process
5. Work Methods Design - The Board View
6. Work Methods Design - Developing a Better Method
7. Process Analysis
8. Activity Charts; Man and machine Charts
9. Operation Analysis
10. Micromotion Study
11. Fundamental Hand Motion
12. Motion Study and Micromotion Study Equipment making the Motion Pictures
13. Film Analysis
14. The use of Fundamental Hand Motions
15. Principles of Motion Economy as Related to the use of the Human Body
16. Principles of Motion Economy as Related to the Work Place
17. Principles of Motion Economy as Related to the Design of Tools and Equipment
18. Motion Study, Mechanization, and Automation
19. Standardization - Written Standard Practice
20. Time Study; Time Study Equipment; Making the Time Study
21. Time Study: Determining the Rating Factor
22. Time Study: Determining Allowances and Time
23. Determining Time Standards from Standard Data and Formulas
24. Use of Standard Data and Formulas for Gear Hobbing
25. Computer Aided Time Study
26. Computerized Machine and Equipment Downtime Monitoring and Reporting
27. Predetermined Time Systems: The Work-Factor Systems
28. Predetermined Time Systems: Methods-Time Measurement
29. Standard Data from Predetermined Times- Computer Aided Wage Incentive Application
30. Work Sampling
31. Measuring Work by Physiological Methods
32. Fatigue
33. Human Factors
34. Wage Payment- The Relation of Motion and Time Study to Wage Incentives
35. Multy-Factor wage Incentive Plans Evaluating and Controlling Factors Other Than Labor
36. Extent to Which Motion and Time Study may be Profitably Used
37. Motion and Time Stuidy Training Programs - Deliberate Change
38. Training the Operator - Effect of Practice
39. Motivation and Work
40. Job Enlargement: A manufacturing System Designed for people- Volvo Improving the Quality of Work Life at General Motors
41. Evolution of Measurement, Incentives and Design of Work at Kodak Park
42. Motorola Participative Management program
43. The Lakeview Plan;
Appendix A: Wage Incentive Manual;
Appendix B: Matric System Conversion Tables;
Problems; Bibliography; periodicals; Index.

Motion ,Time, Study Design, Measurement , Work.

There are no comments on this title.

to post a comment.

Implemented and Maintained by Central Library, Assam Don Bosco University
For any Suggestions/Query Contact to library or E-mail: [email protected]. Phone No:91+8638042220
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
HTML Counter
Visitors

Powered by Koha